According to regulations, what system must each Enrollee develop and implement concerning sewer management?

Get ready for the CWEA Collections Grade 2 Journey/Analyst Test. Study with multiple choice questions and detailed explanations to prepare effectively for the exam!

The requirement for each Enrollee to develop and implement a specific system for sewer management is encapsulated in the Sewer System Management Plan (SSMP). The SSMP is a comprehensive document that outlines how a sewer agency manages its sewer system, ensuring compliance with state regulations and federal standards. It serves to provide a systematic approach to managing the infrastructure, addressing issues such as maintenance, capacity, and emergencies.

The SSMP is critical in maintaining a functional sewer system, preventing overflows and environmental hazards, and ensuring that the agency is prepared for both routine operations and unforeseen incidents. The plan must include elements such as a system description, the organization’s goals and objectives, and procedures for managing assets effectively. It also emphasizes the need for regular updates and reviews to adapt to changing circumstances and regulatory requirements.

In contrast, the other options are related but do not specifically address the necessary plan as mandated for sewer management. A Sewer Code Compliance Document may pertain to adhering to local codes, while a Wastewater Treatment Management Plan and a Stormwater Control Strategy focus on different aspects of water management but do not encapsulate the complete requirements outlined in the SSMP. Thus, the SSMP is the correct and comprehensive framework required for sewer management by each Enrollee.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy